Renovations in the GTA
Every week of your build,
planned before we start.
Interior renovations, additions and basement entrances with a written quote and a week-by-week programme you can follow, from the first day to the day we hand back the keys.
- 13towns served across the GTA
- One teamdesign and build under one roof
- 10 yrstructural guarantee

- Survey & designDone
- Strip-out & framingDone
- Rough-insNow
- Drywall & plasterNext
- Tile & floorsNext
- Kitchen & carpentryNext
- FinishesNext
- HandoverNext
This week Plumbing, electrical and heating run before the walls are closed.
Before and after
Drag the line on each picture to see the house before we started.
BeforeAfter
Richmond Hill · Full-home renovation
The Long Point house
A whole house in Oak Ridges, renovated top to bottom.
- Programme
- About 10 weeks
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
Peterborough · Basement renovation
The Goodfellow basement
A basement kitchen and bathroom in Peterborough, finished as one suite.
- Programme
- About 4 weeks
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
GTA · Basement entrance
The walkout entrance
A basement given its own front door: a below-grade walkout cut into the foundation.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
Richmond Hill · Kitchen renovation
The waterfall-island kitchen
A main kitchen rebuilt around a stone island, with a kitchenette for the basement suite.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
Richmond Hill · Bathroom renovation
The epoxy-floor bathroom
A bathroom with a heated, poured-epoxy floor that glows like water.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
Richmond Hill · Bathroom renovation
The grey-tile bathroom
A tired bathroom taken back to the studs and rebuilt around a tiled shower.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
Ajax · Basement entrance
The Ajax side entrance
A side door cut through brick, so the basement gets an entrance of its own.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
GTA · Window replacement
The big rear window
One big rear window, out with the dated sliders and in with new casements.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
GTA · Full-home renovation
The whole-home renovation
A whole home renovated in 2022 — kitchen, two bathrooms, and a new deck.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
BeforeAfter
Hamilton · Garage addition
The Hamilton garage foundations
The foundations for a garage addition in Hamilton, by ZCB.
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Status
- Finished
How a build goes
The same four stages every time, so you always know what comes next.
01
A free visit
We come round, measure up and listen. You get honest advice on what is worth doing.
02
A written quote
A detailed written quote and a week-by-week plan before anything starts. The price is in writing.
03
The build
Our own team on site, a tidy site every evening and a plan you can follow week by week.
04
Handover
A walk-through together, then the keys, the paperwork and the warranty.
What we build
Interior renovations
Whole homes, kitchens and bathrooms, designed and built by one team.
PriceBy written quote
Typical programme6 to 16 weeks
Kitchen renovations
Kitchens rebuilt around how you actually cook and gather.
PriceBy written quote
Typical programme4 to 8 weeks
Bathroom renovations
Bathrooms and en-suites, tiled and waterproofed properly.
PriceBy written quote
Typical programme3 to 6 weeks
Additions
More room, built onto the house you already have.
PriceBy written quote
Typical programme10 to 20 weeks
Basement separate entrances
A separate entrance that makes the basement its own space.
PriceBy written quote
Typical programme4 to 8 weeks
Garage foundations
Footings and slabs poured true, ready for the build above.
PriceBy written quote
Typical programme2 to 5 weeks
Window replacement
Old windows out, new windows in, sealed and trimmed.
PriceBy written quote
Typical programme1 to 3 weeks
Door replacement
Entry and interior doors, fitted and finished.
PriceBy written quote
Typical programme1 to 2 weeks
Interior hardwood stairs
Hardwood stairs measured, built and finished to fit your floors.
PriceBy written quote
Typical programme2 to 4 weeks
What clients say
5.01 review on Google
- Google review
Really good location with reasonable price
Ten years, in writing
Every structural job carries a ten-year guarantee, backed by an insurer, so it holds even if we are not around.
10-year structural guarantee
- Foundations and walls
- Steelwork and beams
- Roof structure
- Waterproofing
Insurance-backed, transferable if you sell.
A rough price, in a minute
Pick the project and the size. We give you a range now and a written quote after a free visit.
Questions before a build
Many projects do — additions, basement entrances and structural changes need one in Ontario. We check at the first visit and tell you plainly what applies to your house.
The quote is detailed and in writing. It only changes if you change the plan, and you see the cost before you decide.
Often, yes. We plan the work in stages, keep the site tidy every evening and agree the sequence with you first.
Stage payments as each phase is completed. Nothing is paid for work that has not been done.
Build it once,
build it properly.
Tell us about the house. Call 416-878-6669, or send a message and we will reply within one working day.
Get a free quote