Get a free quote

What we build

Interior renovations first — plus the structural work that goes with them. Every job quoted in writing.

A renovated bathroom by ZCB Construction Inc
  1. Interior renovations

    Whole homes, kitchens and bathrooms, designed and built by one team.

    PriceBy written quote

    Typical programme

    6 to 16 weeks

    Included

    • Design and layout
    • Kitchens and bathrooms
    • Finishes throughout
  2. Kitchen renovations

    Kitchens rebuilt around how you actually cook and gather.

    PriceBy written quote

    Typical programme

    4 to 8 weeks

    Included

    • Layout changes
    • Cabinets and counters
    • Tile and flooring
  3. Bathroom renovations

    Bathrooms and en-suites, tiled and waterproofed properly.

    PriceBy written quote

    Typical programme

    3 to 6 weeks

    Included

    • Tile and waterproofing
    • Fixtures and vanities
    • Tubs and showers
  4. Additions

    More room, built onto the house you already have.

    PriceBy written quote

    Typical programme

    10 to 20 weeks

    Included

    • Foundations and framing
    • Roof and envelope
    • Interior finishes
  5. Basement separate entrances

    A separate entrance that makes the basement its own space.

    PriceBy written quote

    Typical programme

    4 to 8 weeks

    Included

    • New entrance and stairs
    • Waterproofing and drainage
    • Interior finishing
  6. Garage foundations

    Footings and slabs poured true, ready for the build above.

    PriceBy written quote

    Typical programme

    2 to 5 weeks

    Included

    • Excavation
    • Footings and slab
    • Drainage
  7. Window replacement

    Old windows out, new windows in, sealed and trimmed.

    PriceBy written quote

    Typical programme

    1 to 3 weeks

    Included

    • Old windows removed
    • New windows installed
    • Sealing and trim
  8. Door replacement

    Entry and interior doors, fitted and finished.

    PriceBy written quote

    Typical programme

    1 to 2 weeks

    Included

    • Entry and interior doors
    • Hardware and locks
    • Trim and finishing
  9. Interior hardwood stairs

    Hardwood stairs measured, built and finished to fit your floors.

    PriceBy written quote

    Typical programme

    2 to 4 weeks

    Included

    • Measured to fit
    • Hardwood treads and rails
    • Finish matched to floors

How a build goes

  1. 01A free visitWe come round, measure up and listen. You get honest advice on what is worth doing.
  2. 02A written quoteA detailed written quote and a week-by-week plan before anything starts. The price is in writing.
  3. 03The buildOur own team on site, a tidy site every evening and a plan you can follow week by week.
  4. 04HandoverA walk-through together, then the keys, the paperwork and the warranty.
A renovated laundry room by ZCB Construction Inc